Our company performed a complex heavy lift operation involving the safe unloading and accurate positioning of a 170-ton ammonia synthesis column. A key challenge was that the entire heavy equipment unloading and installation took place at night — a necessity to meet the tight project schedule and maintain uninterrupted industrial operations. As is typical in complex industrial equipment relocation projects, certain logistics delays occurred. However, our experienced team ensured that the heavy lift operation continued without delays by working overnight to deliver the project on time. Despite the challenging working conditions — large equipment dimensions, night-time operations and tight deadlines — all tasks were completed with full compliance with health and safety standards, using proven methods for heavy equipment handling. To safely lift and position the ammonia synthesis column, our specialists used the Enerpac SLB-300 hydraulic gantry system — a reliable solution for heavy lifting and precise positioning in confined spaces where a crane cannot be used.
-
Scope of work:
Heavy lift operation for a 170-ton ammonia synthesis column
Industrial equipment unloading and on-site positioning
Night-time work to meet tight project deadlines
Use of Enerpac SLB-300 hydraulic gantry system for safe lifting
Precise placement and anchoring of heavy industrial equipment
Full compliance with international heavy lift safety standards -
Work execution period
February 2024
Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.