Unloading of a 170-tonne synthesis column
Precise manoeuvring of a super-heavy load in a tight industrial setting.
About project
The SM Industry team successfully unloaded a 170-tonne synthesis column inside an operating production facility without disrupting adjacent processes. A custom rigging plan and hydraulic system were developed to ensure both safety and efficiency.
-
Scope of work:
Engineering preparation, creation of a custom rigging solution using Enerpac hydraulic systems, precision manoeuvring in tight conditions, safe positioning and final transfer of the column to the client.
-
Work execution period
January — March 2024