Unloading of a 170-tonne synthesis column

Precise manoeuvring of a super-heavy load in a tight industrial setting.

About project

The SM Industry team successfully unloaded a 170-tonne synthesis column inside an operating production facility without disrupting adjacent processes. A custom rigging plan and hydraulic system were developed to ensure both safety and efficiency.

  • Scope of work:

    Engineering preparation, creation of a custom rigging solution using Enerpac hydraulic systems, precision manoeuvring in tight conditions, safe positioning and final transfer of the column to the client.

  • Work execution period

    January — March 2024