Contact Us

Unloading and Installation of a 150-Ton Extraction Column for Oilseed Processing

About project

SM Industry successfully completed a full scope of works involving the unloading and precise installation of a 150-ton extraction column designed for oilseed product processing. The work included unloading the equipment from the transport vehicle, moving it to the designated area, and installing it in the project position on prepared foundations. All necessary preparatory measures were completed in advance by SM Industry: rotating mechanisms were assembled, rollers and other essential components were installed to ensure precise and safe installation of the column. The core operations were carried out using the Enerpac SLB-300 hydraulic gantry system, which provided accurate control during lifting and positioning of the heavy structure. All works were performed by SM Industry in strict accordance with technical documentation, meeting all industrial safety standards and requirements for precision installation of heavy process equipment.

  • Scope of work:

    Unloading of a 150-ton extraction column.
    Relocation and positioning on prepared foundations.
    Assembly of rotating mechanisms, rollers, and installation accessories.
    Use of Enerpac SLB-300 hydraulic gantry system for controlled lifting and movement.
    Precise alignment and safe installation of heavy process equipment.
    Compliance with safety regulations and technical documentation.

  • Work execution period

    January 2024

Ready to discuss your project? Get in touch with our team:

Request tour free consultation

Reach out to us for a professional consultation and a tailored solution for your business.

Avoid costly mistakes! Get a free expert guide with key steps to ensure a smooth and efficient move.