Replacement and Servicing of Four 38-Ton Hydraulic Presses for Hortex

About project

SM Industry successfully completed a technically complex project for Hortex, involving the replacement of four hydraulic presses, each weighing 38 tons. The project scope included full dismantling of the equipment, transportation to a service centre for technical maintenance, and subsequent reinstallation at the Hortex production facility. In the first stage, SM Industry dismantled all four presses, moved them outside the building, organised the loading operations, and transported the presses to the service centre. After the service works were completed, the presses were delivered back to the site and precisely reinstalled in their designated working positions. A key challenge of this project was the limited space conditions: restricted ceiling height, minimal manoeuvring space for equipment, and no possibility to use large heavy lifting cranes. The presses were installed on 1.2-metre-high foundations, which required specialised lifting solutions and precise work coordination. All tasks were completed thanks to the high professionalism and experience of the SM Industry team. A crew of six qualified specialists was engaged in the project. Each dismantling and reinstallation cycle for one press took approximately four days. The overall project duration depended mainly on the waiting time for the equipment to return from the service centre. Despite this, all work was delivered safely, on time and to a high standard — once again proving SM Industry’s capability to execute technically challenging projects in complex industrial conditions.

  • Scope of work:

    Dismantling of four 38-ton hydraulic presses.
    Relocation to an external area and transport to a service centre.
    Organisation of loading and unloading operations.
    Return transport and precise reinstallation at Hortex.
    Installation on 1.2-metre-high foundations with restricted space.
    Use of specialised lifting solutions and manoeuvring methods.
    Project executed by a six-person SM Industry specialist team.
    Full compliance with safety standards and technical requirements.

  • Work execution period

    May 2024

Ready to discuss your project? Get in touch with our team:

Request tour free consultation

Reach out to us for a professional consultation and a tailored solution for your business.

Avoid costly mistakes! Get a free expert guide with key steps to ensure a smooth and efficient move.