
Relocation of equipment at the PHILIP MORRIS plant
High-precision relocation with full protection and zero recalibration.
About project
SM Industry relocated highly sensitive equipment for Philip Morris with a key condition: preserving exact calibration at the new site. To achieve this, vacuum packaging with aluminium barrier foil was used to shield components from moisture, dust, and mechanical stress.
-
Scope of work:
Development of dismantling plans tailored to precision equipment, vacuum packaging of sensitive units, controlled transport with calibration preserved, and reinstallation with full alignment to original specs.
-
Work execution period
January — March 2024



Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.