Contact Us

Relocation of equipment at the PHILIP MORRIS plant

High-precision relocation with full protection and zero recalibration.

About project

SM Industry relocated highly sensitive equipment for Philip Morris with a key condition: preserving exact calibration at the new site. To achieve this, vacuum packaging with aluminium barrier foil was used to shield components from moisture, dust, and mechanical stress.

  • Scope of work:

    Development of dismantling plans tailored to precision equipment, vacuum packaging of sensitive units, controlled transport with calibration preserved, and reinstallation with full alignment to original specs.

  • Work execution period

    January — March 2024

Ready to discuss your project? Get in touch with our team:

Request tour free consultation

Reach out to us for a professional consultation and a tailored solution for your business.

Avoid costly mistakes! Get a free expert guide with key steps to ensure a smooth and efficient move.