Relocation and installation of power transformers
High-voltage transformer relocation with strict safety compliance.
About project
SM Industry managed the relocation and installation of industrial power transformers with varying capacities. The project involved detailed site planning, precise placement, and integration with existing power grids — while ensuring adherence to high-voltage safety regulations at every stage.
-
Scope of work:
Engineering load calculations, selection of optimal lifting systems, implementation of safety procedures for high-voltage work, transformer positioning, and commissioning with protective systems setup.
-
Work execution period
January — March 2024