Contact Us

Installation of a 65-tonne press at the AXOR plant

Professional installation of a large press at one of the largest plants in Eastern Europe.

About project

SM Industry delivered the full cycle of installation for a 65-tonne industrial press at the AXOR plant. The process included transportation, positioning, and commissioning in strict accordance with technical documentation and safety protocols.

  • Scope of work:

    Precision positioning and installation of the press using heavy-lift equipment. Calibration and setup to meet operational specifications

  • Work execution period

    March — May 2023

Ready to discuss your project? Get in touch with our team:

Request tour free consultation

Reach out to us for a professional consultation and a tailored solution for your business.

Avoid costly mistakes! Get a free expert guide with key steps to ensure a smooth and efficient move.