
Installation of cable production line components
Precise handling and setup of over 500 tonnes of industrial machinery.
About project
This project involved unloading and installing cable production line equipment with a combined weight exceeding 500 tonnes. Despite spatial limitations, SM Industry completed the operation without floor damage, using its own transport technology and distributed load systems.
-
Scope of work:
Development of a component layout optimised for workflow, implementation of heavy-load transport platforms, precision alignment of line elements, and integration of automation and control systems.
-
Work execution period
January — March 2024



Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.