Installation of a Technological Calcination Line
About project
SM INDUSTRY successfully completed the installation of a technological calcination line, including large-scale equipment, auxiliary systems, and full integration into the plant infrastructure. The project included installing eight steel silos for raw material storage and a key ball mill weighing over 180 tons. The installation involved precise mounting of foundations, bearings, drum, gearbox, and motor, followed by loading grinding media and protective covers. Additionally, three industrial filters and a material separation system were installed to meet environmental standards. Screw conveyors and air ducts ensured continuous material flow and proper ventilation. The project finished with installing unloading and packaging systems for the final product.
-
Scope of work:
Installation of steel silos and ball mill (180+ tons).
Industrial filtration and material separation systems.
Screw conveyors and ventilation ducts.
Finished product unloading and packaging systems. -
Work execution period
December 2021
Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.