Installation of a Technological Calcination Line

About project

SM INDUSTRY successfully completed the installation of a technological calcination line, including large-scale equipment, auxiliary systems, and full integration into the plant infrastructure. The project included installing eight steel silos for raw material storage and a key ball mill weighing over 180 tons. The installation involved precise mounting of foundations, bearings, drum, gearbox, and motor, followed by loading grinding media and protective covers. Additionally, three industrial filters and a material separation system were installed to meet environmental standards. Screw conveyors and air ducts ensured continuous material flow and proper ventilation. The project finished with installing unloading and packaging systems for the final product.

  • Scope of work:

    Installation of steel silos and ball mill (180+ tons).
    Industrial filtration and material separation systems.
    Screw conveyors and ventilation ducts.
    Finished product unloading and packaging systems.

  • Work execution period

    December 2021

Ready to discuss your project? Get in touch with our team:

Request tour free consultation

Reach out to us for a professional consultation and a tailored solution for your business.

Avoid costly mistakes! Get a free expert guide with key steps to ensure a smooth and efficient move.