
Installation of a 35-tonne industrial boiler room
End-to-end installation of a boiler unit with custom site integration.
About project
As part of a full-cycle infrastructure upgrade, SM Industry installed a 35-tonne boiler room system. The project involved preparation of the site, structural modifications, connection of utilities, and integration of automation and safety features — all within a confined indoor space.
-
Scope of work:
Wall opening preparation, boiler positioning in tight conditions, pipeline installation, utility connections, and setup of automation and safety systems for continuous operation.
-
Work execution period
January — March 2024



Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.