Installation of a 100 tonne press at the ZEUS CERAMICA plant

Turnkey setup of a SACMI hydraulic press for high-volume ceramic tile production.

About project

A turnkey installation of a SACMI hydraulic press for ZEUS CERAMICA. The project demanded exact mechanical and electrical integration to ensure reliable tile production from the first run.

  • Scope of work:

    Foundation preparation and transport of the 100-tonne press. Installation, connection, and test commissioning of the equipment

  • Work execution period

    July — September 2023