Installation of a 100 tonne press at the ZEUS CERAMICA plant
Turnkey setup of a SACMI hydraulic press for high-volume ceramic tile production.
About project
A turnkey installation of a SACMI hydraulic press for ZEUS CERAMICA. The project demanded exact mechanical and electrical integration to ensure reliable tile production from the first run.
-
Scope of work:
Foundation preparation and transport of the 100-tonne press. Installation, connection, and test commissioning of the equipment
-
Work execution period
July — September 2023