Dismantling of the Tetra Pak filling line
Safe dismantling of a complex milk packaging system with full functionality preserved.
About project
Our company successfully completed a comprehensive dismantling project involving the full disconnection and safe removal of a Tetra Pak dry milk packaging line. As part of the project, the entire line was disconnected from electrical power, pneumatic systems, and other industrial utilities. All components of the Tetra Pak line were carefully dismantled, sorted, and securely packed on pallets or wrapped in protective film to meet all safety requirements for industrial equipment transport. Special attention was paid to properly securing all parts to prevent any damage during relocation. The dismantled Tetra Pak packaging line was fully prepared for safe transport and future reinstallation at a new production facility, ensuring smooth recommissioning with minimal downtime.
-
Scope of work:
Complete dismantling of a Tetra Pak dry milk packaging line.
Disconnection from electrical, pneumatic, and utility systems.
Careful sorting and protective packaging of all line components.
Securing equipment for safe transport.
Preparation for relocation and reinstallation at a new site.
Compliance with industrial dismantling and transport safety standards. -
Work execution period
September 2024
Ready to discuss your project? Get in touch with our team:
- Phone: +48 575 595 675
- Email:: office@sm-industry.eu
Request tour free consultation
Reach out to us for a professional consultation and a tailored solution for your business.